Finishing Works

Interlock Work

Paving that stays flat under load

60mmVehicle-Grade Block
15yrExpected Life
056 483 6606 Get a Quote
Interlock Work

The base does the work

Interlock settles and rutts when the sub-base is thin or poorly compacted. We excavate to the depth the loading requires, compact aggregate in layers, and screed a consistent bedding course before a single block is laid.

Edges hold it together

Interlock is a flexible pavement: without proper kerb or haunched edge restraint the whole field creeps outward. Every edge is restrained before jointing.

Pattern with intent

Herringbone where vehicles run, stretcher bond for pedestrian areas, with contrasting borders to define parking bays and pathways.

Included in this service

  • Excavation and sub-base
  • Compacted aggregate layers
  • Interlock and paver laying
  • Kerbstone and edge restraint
  • Pattern and border detailing
  • Jointing sand and compaction

Also Available

Other services